Ayodhya news: Preparations are in full swing for the entry of Ram Raja in the country. Ram Lalla is going to sit on an eight feet high gold studded throne in the sanctum sanctorum. The construction work of this throne is also going on at a fast pace.
Ayodhya news: Almost 80 percent of the construction work of the grand Ram temple being built in Ayodhya has been completed. Now all we have to do is wait for the consecration program of Lord Ram. The ground floor of Ram temple has to be prepared by December 15 under all circumstances. A three feet high, eight feet long and four feet wide golden throne is to be placed in the sanctum sanctorum for Ram Lala to sit. Ayodhyapati King Ram will sit on an eight feet high gold throne in his palace. This throne will be coated with gold. It will reach Ayodhya by 15th December.
Acceleration in construction work
Due to the consecration ceremony, the construction work has also been expedited. For this, the number of laborers has also been increased as per the requirement. The flooring work of the circumambulation path in the temple has also been completed. Now the work of laying marble on the floor of the Griha Mandap is going on. The work of the entrance gate of Ram Mandir’s parkota is also in the final stage. The roof of all three floors of the passenger convenience center has fallen. Safety equipment is also being installed.
Good use of donated items
According to Ram Mandir Trustee Dr. Anil, before the construction of the temple, Ram devotees have also donated a large amount of gold and silver items. Many problems are being faced in keeping the donated things safe. In such a situation, they will be kept safe by melting them. This work will be done under the guidance of a reputed organization. These things will be used to enhance the beauty of the temple.
Also read – How to Plan a Getaway to Ayodhya for a Grand Deepotsav 2023